Contact Us  |  Downloads  |  CDIA Office Center

Executive Summary Iloilo Pre-feasibility study – Ferry System

es-guimaras

With its proximity to Iloilo City, its beaches and idyllic farms and rural places, activities in Guimaras are expected to grow. If this growth is to be nurtured, the gateways to the island province - the ferry stations - need to be more than just mere utilitarian piers for loading and unloading. Hence, the development vision is one that sees the pier sites as modern ferry stations complete with ... [Continue Reading]

Executive Summary Iloilo Pre-feasibility Study – CBD revitalization

es-iloilo

The Iloilo CBD is the economic center of the City that is the traditional high-urban destination for the towns of the Metro Iloilo-Guimaras region. Conceptually, the CBD’s revitalization aims to transform the Iloilo downtown into a competitive, interesting and dynamic place that attracts businesses and where the existing community therein can grow in a sound, convenient and healthy place. The ... [Continue Reading]

Executive Summary Iloilo Capacity Building Plan

es-iloilo-cap

Executive Summary MIGEDC needs to capacitate itself if it were to assume a more proactive development coordinative role in the region.   This can be done through training and institutional development — essential elements of an effective capacity building program.  Undertaking one without the other often leads to meaningless results. MIGEDC has undertaken several initiatives to build ... [Continue Reading]

Executive Summary Guiyang Pre-Feasibility Study – Water Supply

aha reservoir

The main source of drinking water and industrial water for Guiyang City and surrounding urban areas comes from Hongfeng Lake, Baihua Lake and Aha Reservoir (THE THREE PRECIOUS WATER VATS OF THE CITY OF GUIYANG). The LAKES 1 and its catchment are badly polluted and to improve and protect this precious supply of drinking water the City has initiated corrective measures led by the formation of the ... [Continue Reading]

Executive Summary Guiyang Pre-feasibility Study – LRT

Guiyang-skyline-3

The review was based on specialist and systemic analysis of the P-FSR, discussions with officials of local institutions, confrontation with information available in official publications, properties of international state of the art projects and interdisciplinary development and scrutinizing of risks, opportunities and points of special attention for the next planned project phase. The mission ... [Continue Reading]

Executive Summary Yangzhou Pre-feasibility Study – Water

es-yangzhou

Background of the project: To keep pace with the growing demand for water due to its continued urbanisation and economic growth, the City of Yangzhou has built two water intake plants and three water treatment plants since the completion of its first water supply plant in 1960. Expansion of the City, integration of outlying and suburban areas and growth of industry along the Yangtze has raised ... [Continue Reading]

Executive Summary Faisalabad Prefeasibility Study – Industrial Waste Management

Executive Summary Faisalabad Prefeasibility Study - Industrial Waste Management Download ... [Continue Reading]

Executive Summary Faisalabad Prefeasibility Study – Waste Water Management

es-faisalabad

Background and Introduction of this Assignment Upon the request from the City District Government Faisalabad, Cities Development Initiative for Asia (CDIA) has been engaging the CDGF since July 2008 about how it may support its urban development strategy. CDIA agreed to provide technical assistance to the CDGF on projects in integrated urban environmental infrastructure covering urban transport ... [Continue Reading]

Executive Summary Kathmandu Pre-feasibility Study

es-bishmati

INTRODUCTION The Bishnumati river runs to the immediate west of the old city of Kathmandu. It was once a pleasure to stroll along its banks; children playing in its clear waters, as it flowed through green fields. See front cover. Today it is shunned by all except those who have the misfortune to live and work in its vicinity.The river and its immediate environs is called the Bishnumati ... [Continue Reading]

Executive Summary Ulaan Baatar Pre-Feasibility Study – Energy Efficiency

es-ulanbatar

Executive summary of the proposed Programme Pre-cast concrete panel buildings from the socialist period represent a major part of the housing stock of Ulaanbaatar, the world’s coldest national capital. They comprise 47.000 housing units, sheltering approx. 20% of the total population of more than 1 million inhabitants. These buildings are not insulated and are in a poor state due to a lack of ... [Continue Reading]